1. Prevent moisture. In the clinker transport, storage process, we should pay attention to do a good job of all kinds of protection, rainy day transport must be covered with a rainproof tarpaulin, do not stack in the open air, to avoid clinker moisture hydration, reduce its strength.
2. First inspection, after use, first in first use. Although the clinker quality is stable, but in order to prevent moisture clinker, clinker from different manufacturers, clinker confusion and other situations, resulting in cement product quality is affected, so the clinker into the factory to adhere to the ‘first inspection, after use’ principle; to avoid stacking time is too long, so that the clinker absorbs moisture in the air leading to a decline in strength, we must adhere to the ‘first in, first out’ principle. In order to avoid long stacking time, clinker will absorb air moisture and lead to strength degradation, we should insist on the principle of ‘first in, first out’.
3. In order to ensure the strength and characteristics of cement clinker, clinker should be stored for a long time in moisture-proof, leak-proof steel plate warehouse.
Traditional open storage of clinker and bag storage of clinker is dusty and pollutes the environment. Moreover, in poor weather conditions, the strength of clinker will be reduced to affect the quality of cement. Using steel plate silo to store clinker is not only environmentally friendly and pollution-free, but also further improves the quality of raw materials. Dazheng provides owners with steel plate silo storage system solutions, designing welded steel plate silo, spiral steel plate silo and supporting equipment for owners to choose.
Low investment and small land occupation:Dazheng steel plate warehouse can save about 50% of construction materials and more than 60% of land occupation due to the adoption of many patented technologies.
Waterproof and anti-corrosion: Dazheng's welded steel plate silo adopts patented vacuum sealing technology, the physical index of clinker quality is basically unchanged within 9 months of clinker storage in the silo.
Short construction period and long service life:According to different geological conditions, site environment and capacity, the construction period of steel plate silo usually varies, its construction period is around 4 months and its service life can be up to 30-50 years.
Professional work team:From the initial project feasibility analysis, project configuration, land planning, financial accounting to project construction and project operation, our engineers will provide you with the most reasonable solutions.
Reliable environmental protection system: Clinker loading and unloading process inevitably generates air pollution. We give full consideration to environmental protection requirements in the project design, equipped with dust collector, which can effectively remove the dust generated in the process of feeding and discharging operations, and effectively reduce the dust pollution.
Matters needing attention when using clinker steel plate warehouse
1. According to the relevant storage regulations, the temperature and humidity of the materials in the warehouse should be checked during use. According to the nature of the stored materials and storage time, take the necessary precautions (such as cooling) to ensure the safe storage of all types of materials.
2. When cement clinker is loaded into the warehouse, it shall not exceed 85℃. If the temperature is too high, it will easily cause deformation of the storage body and produce unsafe factors.
3. Pay attention to the sealing inspection of the conveying equipment, gate valve and other facilities used in the steel plate silo. Rainproof inspection of the connecting part of the steel plate silo to prevent rainwater from this link from entering the steel plate silo and causing deterioration of the materials in the steel plate silo.
4. The parts belonging to the large clinker steel plate silo, such as derrick, ladder, corridor, trestle, etc., also need to be inspected every six months and make inspection records, especially paint and welded parts, rusty parts should be treated with anticorrosive treatment, and welded deformation and other cases, remedial measures should be taken immediately.
Anyang Dazheng
Steel Silo Co., Ltd., founded in 2002 with a registered capital of 35.89 million RMB, is a large-scale specialized manufacturer and contractor of steel silos, steel structures, and grain machinery. The company has obtained international certifications for quality, environmental management, and occupational health and safety. It holds 3 invention patents and 54 utility model patents.
The annual production capacity of Dazheng Company is over 2 million cubic meters of steel silos and 36,000 tons of steel structures. The diameter of the steel silos can range from 2.8 meters to 30 meters. Single silo storage capacity reaches 20,000 tons. The height of multi-layer steel structure frameworks can reach 50 meters.
Dazheng has undertaken international projects in countries such as Malaysia, Vietnam, Kenya, South Africa, Eritrea, Russia, Kazakhstan, and Kyrgyzstan, establishing long-term stable cooperative relationships.