Performance characteristics:
-Sturdy and durable: the spiral biting process is used to manufacture, which makes the structure of the steel plate silo more stable, able to withstand greater pressure and weight, and not easy to be deformed in long-term use.
-Good sealing: the spiral biting connection effectively ensures the sealing performance of the silo, prevents the cement from moisture and pollution, and ensures the stable quality of cement.
-Superior anti-corrosion ability: after special surface treatment, it enhances the resistance of the silo to corrosive substances and prolongs the service life.
-Accurate measuring function: Equipped with high-precision measuring device inside, it can accurately measure the stock and output of cement in the silo, providing accurate data for the production of mixing plant.
-Efficient unloading system: the optimized unloading structure enables the cement to flow out quickly and smoothly, which improves the working efficiency of the mixing plant.
-High space utilization: the reasonable design makes full use of the vertical space and achieves a large storage capacity within a limited footprint.
-Easy maintenance: simple structure, convenient daily inspection and maintenance, reducing maintenance cost and time.
Main technical parameters:
-Bin diameter: common range is 3 - 15 meters, can be customized according to actual demand.
-Height of silo: generally between 6 - 30 meters.
-Storage capacity: from tens of cubic meters to thousands of cubic meters.
Thickness of surface anti-corrosion treatment: 0.1 - 0.3 mm.
Main application areas:
-Commercial cement mixing station: as the main cement storage equipment to guarantee the supply of cement needed for production.
-Construction project on-site mixing station: to provide timely cement reserve for construction projects.
-Prefabricated components production plant: to store cement to meet the production demand of prefabricated components.
Important Tips:
-Installation site selection: a site with high terrain, good drainage and solid foundation should be selected to avoid water accumulation and uneven settlement affecting the silo.
-Foundation construction: carry out foundation construction in strict accordance with the design requirements to ensure the flatness and bearing capacity of the foundation.
-Installation process: Installation is carried out by professional personnel to ensure that the screw bite parts are connected tightly and the parts are installed firmly.
-First use: Before putting into use, the silo body should be fully inspected to ensure that there is no abnormality before feeding operation.
-Daily maintenance: Regularly check the sealing of the silo body, the operation of the unloading device and the accuracy of the metering equipment, and discover and deal with the problems in time.
-Cleaning and maintenance: Regularly clean the residual cement in the silo to prevent caking and clogging, as well as maintain the surface of the silo with anti-corrosion treatment.
-Safety operation: During feeding and unloading, the operators should strictly abide by the operation regulations to prevent safety accidents.