Performance Characteristics:
-Power engineering large welded
Steel Plate Silo has a high degree of stability. Well-designed structure and high-quality welding process enable it to remain firm in various complex environments and resist external interference.
-Excellent insulation performance. Adopting special insulating materials and processing methods, effectively avoiding leakage and short-circuit phenomenon between electric equipment and silo body.
-Good fire-retardant properties. It can resist fire to a certain extent and reduce the damage of fire to the electric equipment and materials in the silo.
-Strong ventilation and heat dissipation system. Ensure that the heat generated during the operation of the power equipment in the warehouse is emitted in a timely manner, maintaining the normal working temperature of the equipment and extending its service life.
-Accurate humidity control function. Strictly control the humidity in the warehouse, preventing the humid environment from causing corrosion and failure of electric equipment.
-Perfect safety protection mechanism. Equipped with lightning protection device, fire alarm system, etc., to ensure the safe operation of power engineering.
-Flexible space layout. It can be reasonably partitioned and stored according to the size and shape of different electric equipment and materials, improving the space utilization rate.
Main technical parameters:
-Bin diameter: usually between 10 - 40 meters, can be customized.
-Height of silo: usually 12 - 30 meters.
-Storage capacity: from several thousand cubic meters to ten thousand cubic meters.
-Thickness of steel plate: 6 - 15 millimeters, with thickening in key areas.
-Material: High strength and corrosion resistant steel.
Main application areas:
-Large substation. Used for storing power equipment, cables, etc.
-Electric power material reserve center. As a centralized storage place for materials needed for power projects.
-New energy power station. Such as wind power generation, solar power generation, etc., to store related equipment and materials.
Important Tips:
-Ensure the safety distance from the electric power facilities and meet the electric power code requirements when installing.
-Check the effectiveness of insulation and fire retardant devices regularly.
-Timely adjust ventilation and dehumidification equipment in accordance with humidity control requirements.
-Perform regular testing and maintenance of safety protection mechanisms.
-Follow relevant standards and operating procedures of electric power engineering for storage and management of equipment and materials.
-Pay attention to the cleanliness and hygiene of the warehouse to avoid dust and debris affecting the performance of power equipment.
We offer free, permanent technical support.
For on-site service requests, we respond within 24 hours.
Anyang Dazheng Steel Silo Co., Ltd. provides customized services to meet customer needs, offering high-quality consulting, design, installation, and after-sales support.